11-20-2018, 02:11 PM
i had a long chat with mark at newell today about the process for doing the slide seal. he said he can do one complete from start to end in about 6-7 hours....i will see how many times that it is for me....ha
it does take two guys to take the slide out. my neighbor is helping with that.
and 6 to put it back in.....2 on the inside and 4 on the outside pushing the slide back into place. so i will have to plan that part.
i will take lots of pictures. should be fun
tom
it does take two guys to take the slide out. my neighbor is helping with that.
and 6 to put it back in.....2 on the inside and 4 on the outside pushing the slide back into place. so i will have to plan that part.
i will take lots of pictures. should be fun
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60

