01-14-2016, 01:10 PM
i recently got my rapidaire fast pipe system and am laying it out for the shop.
i will be putting a port for the newell to be on shop air.
the question is this......should i put a check valve inline to the newell so if a massive air leak happens in the newell that the shop air doesnt deplete and run for however long i am out of the shop?
thanks
tom
i will be putting a port for the newell to be on shop air.
the question is this......should i put a check valve inline to the newell so if a massive air leak happens in the newell that the shop air doesnt deplete and run for however long i am out of the shop?
thanks
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60

