10-04-2015, 04:43 PM
an update. now that the weather is cooling down, i am alot more motivated to work....ha
now have 175 tons of 1/4 minus granite in piles around the shop and another 100 tons or so to come this week.
i have been working on the ductwork for the hvac. doug has helped me as i struggled through the design.
i hope to have it done in the next week or so. kinda slow doing it by myself.
the remainder of the wiring should be done in a week or so as well.
then insulation which i will do. (all of this is the mancave)
so, with any luck, i should be ready for drywall for the rest of the shop and the mancave in a couple of weeks.
then the floor coating, then the finish work in the mancave....installation of kitchen, bathroom, etc.
tom
now have 175 tons of 1/4 minus granite in piles around the shop and another 100 tons or so to come this week.
i have been working on the ductwork for the hvac. doug has helped me as i struggled through the design.
i hope to have it done in the next week or so. kinda slow doing it by myself.
the remainder of the wiring should be done in a week or so as well.
then insulation which i will do. (all of this is the mancave)
so, with any luck, i should be ready for drywall for the rest of the shop and the mancave in a couple of weeks.
then the floor coating, then the finish work in the mancave....installation of kitchen, bathroom, etc.
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60