ceiling insulation complete,
a couple of young guys showed up bright and early and had it done in about 3 hours. R38 blown in fiberglass insulation.
he said no problem getting up there and crawling the 60 feet to the other side.
so, it is all insulated now.
all i have to do is make the face frame around the ceiling access opening now for the piece of drywall to sit on. i thought about putting one of those drop down ladders to get up there but then asked myself. when will i EVER go up there?
next is the septic guy and the drywallers to finish. and stucco finish coat. all this week. i hope
tom
a couple of young guys showed up bright and early and had it done in about 3 hours. R38 blown in fiberglass insulation.
he said no problem getting up there and crawling the 60 feet to the other side.
so, it is all insulated now.
all i have to do is make the face frame around the ceiling access opening now for the piece of drywall to sit on. i thought about putting one of those drop down ladders to get up there but then asked myself. when will i EVER go up there?
next is the septic guy and the drywallers to finish. and stucco finish coat. all this week. i hope
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60