12-20-2014, 08:19 PM
the floor was poured in the summer and is flat. i really wanted it flat. there are lots of crack control cuts that were done the day the floor was poured.
i am considering different options on the floor from nothing to commercial airplane hanger urethane.
richard, i am not a fan of the pegboard look for 160 linear feet (the one sidewall, backwall and half of the other side wall.
i had pegboard in my small workshop in mesa and didnt care for it.
i want something that i can hang things, on, be able to spray the floor down and not worry about the covering. i do have a 6" concrete stem before the drywall starts (and the bottom plate).
since my shop will be an extended living area of sorts, i want it to look cool too.
tom
i am considering different options on the floor from nothing to commercial airplane hanger urethane.
richard, i am not a fan of the pegboard look for 160 linear feet (the one sidewall, backwall and half of the other side wall.
i had pegboard in my small workshop in mesa and didnt care for it.
i want something that i can hang things, on, be able to spray the floor down and not worry about the covering. i do have a 6" concrete stem before the drywall starts (and the bottom plate).
since my shop will be an extended living area of sorts, i want it to look cool too.
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60

