12-01-2014, 05:16 PM
Dec 1 update
after weeks of doing wiring, other than making up the breaker panel, (which i cant do till thursday) and making up the switch boxes (which i cant do yet either), i am done for the electrical and plumbing inspection. the builder has to finish putting in the 200a service, but will do that tomorrow. then the power company will come pull the wire.
today the inspector came and approved the stucco lath and walked through the electrical and plumbing with me and pointed out a handful of things i needed to do yet and i did those this afternoon. the official inspection will likely be next monday.
then insulation and drywall. once the drywall is installed, they can do the scratch coat of stucco while they do the mud and painting on the drywall.
making progress and my part for now is slowing down.
tom
after weeks of doing wiring, other than making up the breaker panel, (which i cant do till thursday) and making up the switch boxes (which i cant do yet either), i am done for the electrical and plumbing inspection. the builder has to finish putting in the 200a service, but will do that tomorrow. then the power company will come pull the wire.
today the inspector came and approved the stucco lath and walked through the electrical and plumbing with me and pointed out a handful of things i needed to do yet and i did those this afternoon. the official inspection will likely be next monday.
then insulation and drywall. once the drywall is installed, they can do the scratch coat of stucco while they do the mud and painting on the drywall.
making progress and my part for now is slowing down.
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60