08-26-2014, 04:31 PM
passed final inspections today and it was termite treated.
concrete guys show up at 5 in the morning and cement trucks start rolling in at 6. we missed the big storm last nite and today like was forecasted. still a forecast for rain tonite, but hopefully it will pass us by
the rv pad will be on the right hand side of the shop as you are looking at this picture. it will face the gazebo.
tom
concrete guys show up at 5 in the morning and cement trucks start rolling in at 6. we missed the big storm last nite and today like was forecasted. still a forecast for rain tonite, but hopefully it will pass us by
the rv pad will be on the right hand side of the shop as you are looking at this picture. it will face the gazebo.
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60

