08-25-2014, 10:06 AM
the army of concrete guys showed up this morning at 5 am on the dot. they worked until after 9am and got everything finished ready for final inspection for the pour. since there is a 50% chance of rain tomorrow, the pour is set for 5am wed morning.
plumbers came and wrapped and raised the plumbing as well. and set the box around the shower drain.
tom
plumbers came and wrapped and raised the plumbing as well. and set the box around the shower drain.
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60

