today there was a crew of ten concrete guys. they changed from a separate footer, stem and floor pour to a monolithic pour. the plumber was there to lay out the underground plumbing.
it will be dug and plumbed in the next 2 days and then once they have that done and they have the dimensions for the sill bolts/rods, they will do the pour. gee, maybe this week who knows.
i attached a few pictures that gave a little better perspective on the dimensions. had darlene stand in the back corner with her arms outstretched.
happy 1st saturday
tom
it will be dug and plumbed in the next 2 days and then once they have that done and they have the dimensions for the sill bolts/rods, they will do the pour. gee, maybe this week who knows.
i attached a few pictures that gave a little better perspective on the dimensions. had darlene stand in the back corner with her arms outstretched.
happy 1st saturday
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60