06-20-2014, 08:59 PM
they are heavy machine packing the pad, then 4" of hard packed abc rock. then the stem walls and turn downs, then 6" of 3500 psi concrete with stealth fiber. also doing steel mesh.
i know everyone says rebar, but it was a mixed opinion among the concrete guys and it was REALLY pricey. hope i made the right call. my builder has the same thing in his 9000 sq foot shop and he has heavier equipment in it than the newell.
there will be sawcuts to control cracking.
i am doing a power troweled smooth finish. then am investigating different sealers. will either do a stain and simple sealer or no stain and a nano technology high tech sealer.
tom
i know everyone says rebar, but it was a mixed opinion among the concrete guys and it was REALLY pricey. hope i made the right call. my builder has the same thing in his 9000 sq foot shop and he has heavier equipment in it than the newell.
there will be sawcuts to control cracking.
i am doing a power troweled smooth finish. then am investigating different sealers. will either do a stain and simple sealer or no stain and a nano technology high tech sealer.
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60

