Posts: 1,479
Threads: 98
Joined: Jul 2012
Today I had my generator removed to replace the hydraulic hoses replaced which had ruptured. It takes a forklift to be able to slide the generator out, but I can give some insight into what is required and how to do it with minimum effort when someone is required to to this. It takes about 8 to 10 hours, so plan on $1,000.
2001 Newell #579
tow a Honda Odyssey
fun car: 1935 Mercedes 500K replica
Posts: 5,853
Threads: 500
Joined: Jul 2012
did you say hi to leo for me?
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60
Posts: 1,479
Threads: 98
Joined: Jul 2012
Yep, he asked if I would see you. He has a new helper named Darren who did most of the work. Very qualified and precise.
2001 Newell #579
tow a Honda Odyssey
fun car: 1935 Mercedes 500K replica